Permitted waste sites in England and Wales must now report every load they receive to Defra within two working days. What that means for the IT equipment you send for disposal.
From 1 October 2026, every organisation in England and Wales that is licensed or permitted to receive controlled waste has to report each load it receives through a government service called Report receipt of waste. Scotland and Northern Ireland follow in January 2027. Most IT disposal and recycling sites hold a permit, so if you send old laptops, phones or servers to a disposal provider, their side of the job has changed. This guide explains what changed, what did not, and what it means for you.
It is Defra's replacement for a largely paper based system. Each receiving site enters the details of a load into one national service, by spreadsheet or through its waste software, and gets back a unique reference number. The aim is a near real time, auditable record of where waste goes, which makes it much harder for criminal operators to dump waste or fake disposal records. Defra puts the cost of waste crime at about 1 billion pounds a year.
Defra describes this as the first phase, covering around 12,000 permitted sites. It says the service will later extend to other operators, more than 100,000 in total, but businesses that only produce waste do not report through it today.
The receiving site must submit each load within 2 working days, starting the day after the waste arrives and excluding weekends and bank holidays. A load received at 9am on Monday must be submitted, with a reference number back, by 11:59pm on Wednesday. Errors flagged by the service must be fixed in the same window, and any error found later must be corrected within one month of discovering it.
Discarded IT equipment is usually classified as 16 02 14, or 16 02 13 where it has hazardous components such as some screens and batteries. Your provider confirms the code for each load.
Some disposal blogs say erasure certificates must now carry a digital waste tracking reference. The current GOV.UK guidance does not say that. The reference number belongs to the receiving site's report of a load, not to a data erasure certificate. If a provider tells you it is a legal requirement, ask them for the source.
Very little extra work for you, but your provider now has a hard deadline. They need an accurate description of each load quickly: what it is, how much, and who carried it. A clean list of serials, types and quantities, sent before the collection, makes their report straightforward and makes it easy to match their records to yours. It also gives you a way to check that what arrived is what left your building.
You report every inbound load within two working days, through the spreadsheet or an approved software connection. The quality of your report depends on the quality of the information your customers give you. Collections that arrive with a scanned list of devices are far easier to classify and reconcile than a cage of unlabelled kit.
Asset Cycle gives your customers a phone scanner in the browser, so every collection arrives with a list of serials, device types, photos and condition, downloadable as a spreadsheet. It is software only. It does not submit reports to Defra and is not a connection to the Report receipt of waste service, so your own reporting stays with you. Source: GOV.UK, Report receipt of waste and Digital waste tracking: check if you need to report the waste you receive, both last updated 25 September 2026.