Guide

Planning a large decommission

A step by step plan for retiring hundreds of devices or clearing a site, from the first inventory to the last certificate.

Retiring a whole floor, an office or a server room is a project, not a collection. The equipment is the easy part. The hard parts are knowing exactly what is going, making sure nothing with data on it goes astray, and proving afterwards that everything was handled. A plan written before the first device moves saves weeks of chasing later.

1. Agree the scope and an owner

Write down what is in scope: which sites, rooms and device types, and what is staying. Name one person who owns the job end to end and can make decisions on the day.

2. Inventory before anything moves

Record every device by serial, type, model, location and condition, and mark which ones hold data. Compare the result with your asset register. Anything on the register you cannot find is a finding in its own right, and should be investigated now rather than discovered at the next audit.

3. Pick the provider early

Choose your disposal provider before the inventory is finished, and ask for their column format so your list matches it. Check their waste carrier registration on the Environment Agency public register (or the equivalent in Scotland, Wales or Northern Ireland), their data sanitisation process, and that they issue per serial certificates.

4. Prepare the devices

  • Back up anything still needed and confirm the backup
  • Remove devices from device management and from your directory
  • Turn off Activation Lock, Find My and Factory Reset Protection
  • Save network configurations and licence keys before switching off servers and switches
  • Cancel or transfer licences and support contracts tied to the hardware

5. Stage the equipment

Use one secure staging area. Keep counted and scanned devices physically apart from those still to be checked, label each cage or trolley, and keep the room locked between sessions. Most lost devices go missing between the desk and the van, not in the van.

6. Hand over with a count

On collection day, count the devices and the cages against your list, and get the provider's signature on a collection receipt or waste transfer note that states the numbers.

7. Reconcile and close

When the provider's report and certificates arrive, match every serial against your list. Chase any differences straight away, update the asset register and file the records with your retention period. Only then is the project finished.

A rough timetable

  • Four weeks out: scope, owner, provider chosen
  • Two to three weeks out: inventory complete and reconciled with the register
  • One week out: devices prepared, staging area set up
  • Collection day: count, sign, hand over
  • Two to four weeks after: certificates matched, project closed

How Asset Cycle helps

KaptiveScan runs in the browser on any phone, so the inventory needs no special kit, and each device is recorded with its serial, photos and condition. The list builds in the portal as you go, and downloads as a spreadsheet for your provider when the inventory is done.

More insights

Sitemap · Privacy · Terms · hello@assetcycle.uk